Senok Group

Project Status

Pending Project

Project Location

No-16, 1/16, 2/16, Dr. Lester James Peiris Mawatha, Colombo 05, Sri Lanka.

Project Summary

  • Designing MVAC system for proposed building for Senok Group
  • Cooling capacity of 760 kW water cooled VRF system
  • Designing Car Park Exhaust System
  • Stair Case Pressurization system